Free account, no minimum balance, and you can pause any month.
Public offer · approved by the SEC
Dangote Petroleum Refinery shares are on offer at ₦525 each from 14 September 2026 to 13 October 2026. Buy them like any other share on Shares Saver, through Crown Capital Limited, a licensed NGX broker. For Nigerian nationals with a BVN, a Nigerian bank account, proof of address, and a passport or NIN.
30 seconds
Pick your shares and answer three questions. If you can apply, you go straight to buying. If not, you see what is missing.
₦525 a share. Minimum 10, then multiples of 10.
100 shares at ₦525. If fewer shares are allotted, the difference is refunded.
Answered on this page only. Nothing is sent or stored.
Valid or expired.
Your Bank Verification Number, from any Nigerian bank.
In your own name. You pay from it, and any refund goes back to it.
How it works
Nigerian national, BVN, Nigerian bank account, proof of address, and a passport or NIN.
Sign in, choose the Dangote Refinery IPO application and pay. It costs ₦525 a share.
Once your identity checks are complete, we open your CSCS account with Crown Capital Limited, a regulated stockbroker. No shares are subscribed for before that.
The IPO is then subscribed for and your order shows as pending. Allotted shares go to your CSCS account in your name; anything not allotted is refunded.
For Nigerian nationals with a BVN and a Nigerian bank account. Sign in or create a free account first.
The company
The Dangote Petroleum Refinery, in the Lekki Free Trade Zone in Lagos, is the world’s largest single-train refinery, with a nameplate capacity of 650,000 barrels a day. It supplies petrol and diesel to the Nigerian market and exports refined products.
The IPO offers 4.1 billion ordinary shares at ₦525 each, about ₦2.15 trillion in total, and the shares will list on the Main Board of the Nigerian Exchange (NGX). The proceeds are earmarked for expanding the refinery’s capacity.
Refinery earnings depend on crude oil costs, fuel prices, exchange rates and how reliably the plant runs. The prospectus sets out these risks in full.
Questions
Keep reading
Offer details are taken from the SEC-approved offer as published in September 2026. The prospectus on the official offer website is the authority: check it before you invest.